+977 061 570592, +977 9806776919

We are pleased to report significant advancement in the development of Tower C at Suryothan Luxury Apartments. The structure has now reached full height, and the entire concrete frame including slabs, beams, and columns has been successfully completed. The current stage involves reinforcement work and scaffolding setup, which will support the upcoming stages of construction.


With the core structure now in place, we have begun preparations for brickwork, partitioning, and external wall plastering. Our construction team is working efficiently to ensure quality and speed in execution, while also prioritizing on-site safety and engineering accuracy. At this point, internal plumbing and electrical duct layouts are being planned and will be initiated in the coming weeks. Material procurement and labor coordination for windows, doors, and elevators are already underway to maintain seamless workflow as we enter the finishing stages. Once masonry and basic installations are complete, the focus will shift towards internal plastering, flooring, tiling, and facade detailing. Our project timeline remains on track and we are committed to delivering a well-engineered, luxurious living experience for all future residents. Tower C reflects the same design elegance and construction integrity that define the Suryothan brand. Surrounded by lush greenery and planned with modern urban comforts, this tower will soon offer premium apartments with scenic views and peaceful living. We sincerely thank all our buyers, well-wishers, and stakeholders for their continued support and trust in our vision. We will continue to share monthly updates as we progress through each phase of development.


For more information, visit www.suryothan.com or reach out to our team for assistance.

Leave a Comment